M50UR DEEPENING OF THE TRACK BEDDING

Also in the deepening of the track bedding we have taken the lead in innovation with the development of our M50UR.

The M50UR can work underneath the tracks without a problem. It excavates its way through the track bedding, deepening it by 50 to 100 cm, while simultaneously piling up a provisional track bedding behind itself. The M50UR can be employed in all tunnels, as well as in open areas – without interfering with parallel lines; it thus blocks only a single line of track at a time.

Technical description and data:

Download